Tuesday 06:50, a stain spreads across the 3rd-floor ceiling. The water comes from the 4th, but from where exactly?
Water damage is two stories tangled together: the leak to stop right now, and the claim that will take weeks. Colively keeps both in the same case. It spots when a report looks like an insurance matter and suggests opening a claim on the right policy. You decide, the broker receives the notification by email, and every step is tracked until the payout. Here is the work order.
- Ref.
- SN-0418
- Property
- ACP Les Tilleuls, av. de Tervueren 88, 3rd and 4th floor
- Opened
- Tue. 06:50
The 3rd-floor occupant writes at 06:50. The case notes: likely claim.
An email with two photos. Colively opens the case, identifies the building and the flat affected, and notes that the report looks like water damage. The suggestion to open a claim appears in the case. Nothing is filed without you.
- Urgency and likely claim flagged on reading
- Claim suggested, never opened automatically
- Occupants and co-owners write by email
Hello, there is a big water stain on the bathroom ceiling, it has been dripping since last night. I rang at the 4th floor, nobody answered. Photos attached.
- Issue
- Active leak, bathroom ceiling
- Building
- Les Tilleuls, 3rd floor
- Source
- Probably the 4th floor, to be confirmed
Source unknown? The case stays "to decide", then moves to private.
At intake, nobody knows whether the water comes from a shared riser or a private installation. Colively does not guess: the case is marked "to decide" and goes to you. In the afternoon, the plumber finds the source, a supply fitting in the bathroom of 4B. You move the case to private unit. The classification changes, the history stays.
- Unclear cases go to the syndic, never guessed
- Classification can change once the source is found
- Every change timestamped in the case
- Tue. 06:50Mrs Hermans, occupant 3rd floor · a big water stain on the ceiling
- Tue. 09:15Mr Van Damme, co-owner 4B · I am away, the caretaker has my key
Marked "to decide" at 06:50. Moved to private by the syndic at 15:20, source found.
The leak does not wait for the insurer. The plumber goes this morning.
Stopping the water and drying out are urgent work: they go ahead without waiting for the insurer's go-ahead. You send the request to a plumber and a drying company. The caretaker lets them into 4B with the key the co-owner left.
- Urgent work started without waiting for the insurer
- Leak detection and drying in parallel
- Caretaker assigned to give access
- Plomberie Van AckerPlumbing, leak detection · Average turnaround: same day
- Aqua Dry ServicesDrying · Has worked in the building before
The claim is open on the building policy. The broker has the notification.
You confirm the suggestion: the claim is opened on the building policy recorded for the ACP. The notification goes to the broker by email, with the photos, the plumber's report and the details of the units affected. Colively does not connect to insurer platforms, and never rules on what is covered: the insurer decides that.
- Claim opened by you, on the right policy
- Notification sent to the broker by email
- Building policies recorded once
- Broker
- Cabinet Delhaye, by email
- Notified
- Tue. 16:05
- Loss adjuster
- visit planned Fri. 10:00
- Deductible
- as per policy
- Payout
- pending
- Claim opened
- Notification sent to the broker
- Loss adjuster visit
- Insurer's go-ahead
- Payout received
The loss adjuster visits Friday. Restoration waits for the insurer's go-ahead.
The painter's quote for the 3rd-floor ceiling is in the case, read from its PDF. It will not be approved before the insurer's go-ahead. The caretaker lets the loss adjuster in, and the visit is noted in the claim. If the claim has not been notified or no loss adjuster has been announced, Colively reminds you.
- Restoration on hold until the insurer's go-ahead
- Loss adjuster visit noted in the claim
- Reminders: claim not notified, no loss adjuster, late payment
- Restoration quote receivedPeinture Moreau, PDF read, Wed. 11:30
- Loss adjuster visitFri. 10:00, access via the caretaker
- Insurer's go-aheadpending, tracked in the claim
- Restoration workafter the go-ahead
The payout arrives. The case closes when everything is settled.
After the insurer's go-ahead, the painter does the work and invoices. Colively compares his invoice with the quote. The payout and the deductible, as set by the policy, are noted in the claim. If payment is late, you get a reminder. The case closes with everything inside: photos, notification, loss adjuster's report, invoices.
- Invoice compared with the quote
- Payout and deductible tracked in the claim
- Reminder if payment is late
- Quote approved after go-ahead
- €1,240.00
- Invoiced
- €1,240.00
- Payout
- received, deductible as per policy
CLOSED. Case archived. Every message, file, quote and decision is kept.
Frequently asked questions
See also
All use casesTry it on your own requests.
Free, no credit card.
Forward a real email from a tenant or co-owner and watch what it becomes. Your first cases are on us: judge the result before you pay.